DOD · Air Force Pre-Release SBIR · Direct to Phase II
DAF27BZ02-DV023

A unified model for specification and simulation to design, acquire, and sustain a hybrid- or multi-cloud large scale data analytics system that balances cost, performance, modularity, and security.

Parent BAA: DoW SBIR 2027 BAA · Release 2
Opens
Dec 2, 2026
Closes
Jan 6, 2027
Deadline
—
Component
Air Force

Technical Point of Contact

Elizabeth Loiacono; Aidan Corey

During pre-release, until the topic opens on Dec 2, 2026, you may contact the topic author directly with technical questions. After that, questions go through the Topic Q&A on DSIP.

Projected CMMC Level Requirement

Level 2 (Self)

Technology Areas

  • Air Platform
  • Information Systems

Modernization Priorities

  • Advanced Computing and Software

Keywords

  • Unified Modeling Approach
  • Data System Optimization
  • FinOps
  • CBM+
  • SysML
  • MBSE
  • Cost Predictions
  • Modeling and Simulation
  • Hybrid-Cloud

Objective Summary

Develop and validate an innovative unified financial operations (FinOps) and Model-Based Systems Engineering (MBSE) solution to solve lifecycle cost, resource predictability, and performance modeling challenges within modern defense Condition-Based Maintenance Plus (CBM+) hybrid-cloud systems.

The full objective, description, Phase I, II and III requirements and evaluation criteria are in the official topic on DSIP.

Ready to respond to DAF27BZ02-DV023?

Our defense clients have secured $169M+ in government contracts. Fixed pricing from $1,995 for white papers and concept papers, $9,995 for full BAA technical volumes.

Book Free 30-Min Consultation

Topic details summarized from the official DoW SBIR/STTR solicitation. The full solicitation text, phase descriptions, evaluation criteria and submission requirements are published by the Department of War at dodsbirsttr.mil. Defense Grant Writers does not host or reproduce solicitation content.