DOD · Navy Pre-Release SBIR · Phase I
DON27BZ02-NV023

Attritable Turbine for Low-Cost Attack Systems (ATLAS)

Parent BAA: DoW SBIR 2027 BAA · Release 2
Opens
Dec 2, 2026
Closes
Jan 6, 2027
Deadline
—
Component
Navy

Technical Point of Contact

David Gonzalez; Craig Collins; Christine Myers

During pre-release, until the topic opens on Dec 2, 2026, you may contact the topic author directly with technical questions. After that, questions go through the Topic Q&A on DSIP.

Projected CMMC Level Requirement

Level 2 (Self)

Technology Areas

  • None

Modernization Priorities

  • Advanced Materials
  • Sustainment & Logistics

Keywords

  • Small Gas Turbine Engine
  • Advanced Manufacturing
  • Additive Manufacturing
  • Attritable
  • Disposable
  • Expendable Unmanned Arial Systems Propulsion
  • Low-Cost
  • 150-300 pounds of thrust
  • lbf
  • Limited Life Propulsion

Objective Summary

Design, develop, and prototype a low-cost, limited-life gas turbine engine producing 150-300 lbf of SLS thrust with an estimated engine life expectancy of 10-15 hours, leveraging advanced design and manufacturing techniques to significantly reduce part count, production lead time and scaling, and overall unit cost compared to traditionally manufactured engines in the same class.

The full objective, description, Phase I, II and III requirements and evaluation criteria are in the official topic on DSIP.

Ready to respond to DON27BZ02-NV023?

Our defense clients have secured $169M+ in government contracts. Fixed pricing from $1,995 for white papers and concept papers, $9,995 for full BAA technical volumes.

Book Free 30-Min Consultation

Topic details summarized from the official DoW SBIR/STTR solicitation. The full solicitation text, phase descriptions, evaluation criteria and submission requirements are published by the Department of War at dodsbirsttr.mil. Defense Grant Writers does not host or reproduce solicitation content.